Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from ABI · 23-593 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$844.12
across 0.5 metres
Nugget — precious-metal value
$844.12 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$719.71 /t
gross $844.12 → recovered $759.71 − cost $40.00
Au
100.0%$844.12/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold8.9 g/t$844.128.900 g/t4.4
Silver$0.00783.731 g/t391.9
Platinum$0.0026.655 g/t13.3
Palladium$0.0027.067 g/t13.5
Rhodium$0.002.632 g/t1.3
Copper$0.008.234 %4.1
Zinc$0.0029.913 %15.0
Nickel$0.005.139 %2.6
Lead$0.0039.070 %19.5
Antimony$0.003.795 %1.9
Tungsten$0.000.236 %0.1
Lithium$0.003.063 %1.5
Tin$0.001.858 %0.9
Cobalt$0.002.423 %1.2
Molybdenum$0.001.914 %1.0
Uranium$0.000.445 %0.2
Iron Ore$0.00758.552 %379.3
Gallium$0.002,975.911 g/t1,488.0
Total$844.12

What-If Tonnage Explorer

A back-of-the-envelope estimate — not a mineral resource.

This is not a mineral resource estimate.This tool produces a rough, back-of-the-envelope figure from the dimensions, density, grade and mineralization you enter. It is not NI 43-101 compliant and was not prepared or reviewed by a Qualified Person. Any output is conceptual in nature; real deposits are irregular and grade varies, so actual contained metal may differ materially or be zero. Do not rely on these figures for investment decisions — always refer to the issuer’s NI 43-101 technical report.
Gross tonnage
270 Mt
Mineralized tonnage
135 Mt
Contained Au (conceptual)
38.63 Moz
In-situ value (USD, conceptual)
$114B

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat