Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from LUCA · DDH26-240 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$531.33
across 0.8 metres
Nugget — precious-metal value
$345.19 /t
65% of total value · base metals $186.14/t
Residual — net realizable value
$438.20 /t
gross $531.33 → recovered $478.20 − cost $40.00
Au
49.8%$264.62/t
Ag
15.2%$80.57/t
Cu
4.8%$25.63/t
Zn
28.8%$152.95/t
Pb
1.4%$7.56/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold2.79 g/t$264.625.602 g/t4.5
Silver74.81 g/t$80.57493.319 g/t394.7
Platinum$0.0016.778 g/t13.4
Palladium$0.0017.037 g/t13.6
Rhodium$0.001.657 g/t1.3
Copper0.25 %$25.635.183 %4.1
Zinc5.42 %$152.9518.829 %15.1
Nickel$0.003.235 %2.6
Lead0.35 %$7.5624.593 %19.7
Antimony$0.002.389 %1.9
Tungsten$0.000.149 %0.1
Lithium$0.001.928 %1.5
Tin$0.001.169 %0.9
Cobalt$0.001.525 %1.2
Molybdenum$0.001.205 %1.0
Uranium$0.000.280 %0.2
Iron Ore$0.00477.470 %382.0
Gallium$0.001,873.185 g/t1,498.5
Total$531.33

What-If Tonnage Explorer

A back-of-the-envelope estimate — not a mineral resource.

This is not a mineral resource estimate.This tool produces a rough, back-of-the-envelope figure from the dimensions, density, grade and mineralization you enter. It is not NI 43-101 compliant and was not prepared or reviewed by a Qualified Person. Any output is conceptual in nature; real deposits are irregular and grade varies, so actual contained metal may differ materially or be zero. Do not rely on these figures for investment decisions — always refer to the issuer’s NI 43-101 technical report.
Gross tonnage
270 Mt
Mineralized tonnage
135 Mt
Contained Au (conceptual)
12.11 Moz
In-situ value (USD, conceptual)
$35.7B

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat