Drill Calculator
Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).
Used for residual (net) value below. Defaults are industry starting points — override for your deposit.
| Metal | Input Grade | $/tonne | Eq. Grade | Gram-m |
|---|---|---|---|---|
| Gold | — | $0.00 | 2.957 g/t | 2.4 |
| Silver | 46.5 g/t | $50.08 | 260.430 g/t | 208.3 |
| Platinum | — | $0.00 | 8.857 g/t | 7.1 |
| Palladium | — | $0.00 | 8.994 g/t | 7.2 |
| Rhodium | — | $0.00 | 0.875 g/t | 0.7 |
| Copper | 1.25 % | $128.14 | 2.736 % | 2.2 |
| Zinc | 0.19 % | $5.36 | 9.940 % | 8.0 |
| Nickel | — | $0.00 | 1.708 % | 1.4 |
| Lead | 0.47 % | $10.15 | 12.983 % | 10.4 |
| Antimony | 0.39 % | $86.75 | 1.261 % | 1.0 |
| Tungsten | — | $0.00 | 0.079 % | 0.1 |
| Lithium | — | $0.00 | 1.018 % | 0.8 |
| Tin | — | $0.00 | 0.617 % | 0.5 |
| Cobalt | — | $0.00 | 0.805 % | 0.6 |
| Molybdenum | — | $0.00 | 0.636 % | 0.5 |
| Uranium | — | $0.00 | 0.148 % | 0.1 |
| Iron Ore | — | $0.00 | 252.064 % | 201.7 |
| Gallium | — | $0.00 | 988.882 g/t | 791.1 |
| Total | $280.50 |
What-If Tonnage Explorer
A back-of-the-envelope estimate — not a mineral resource.
- Gross tonnage
- 270 Mt
- Mineralized tonnage
- 135 Mt
- Contained Ag (conceptual)
- 201.83 Moz
- In-situ value (USD, conceptual)
- $6.8B
How to read this
- Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
- Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
- Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
- Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
- Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
- Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.
This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.