Drill Calculator
Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).
Used for residual (net) value below. Defaults are industry starting points — override for your deposit.
| Metal | Input Grade | $/tonne | Eq. Grade | Gram-m |
|---|---|---|---|---|
| Gold | — | $0.00 | 350.480 g/t | 26,128.3 |
| Silver | — | $0.00 | 30,863.147 g/t | 2,300,847.6 |
| Platinum | — | $0.00 | 1,049.660 g/t | 78,252.2 |
| Palladium | — | $0.00 | 1,065.892 g/t | 79,462.3 |
| Rhodium | — | $0.00 | 103.651 g/t | 7,727.2 |
| Copper | — | $0.00 | 324.257 % | 24,173.3 |
| Zinc | — | $0.00 | 1,177.964 % | 87,817.2 |
| Nickel | — | $0.00 | 202.388 % | 15,088.1 |
| Lead | — | $0.00 | 1,538.565 % | 114,700.0 |
| Antimony | — | $0.00 | 149.434 % | 11,140.3 |
| Tungsten | — | $0.00 | 9.311 % | 694.2 |
| Lithium | — | $0.00 | 120.624 % | 8,992.5 |
| Tin | — | $0.00 | 73.158 % | 5,454.0 |
| Cobalt | 95.43 % | $33,241.13 | 95.430 % | 7,114.3 |
| Molybdenum | — | $0.00 | 75.390 % | 5,620.3 |
| Uranium | — | $0.00 | 17.522 % | 1,306.3 |
| Iron Ore | — | $0.00 | 29,871.610 % | 2,226,928.6 |
| Gallium | — | $0.00 | 117,190.651 g/t | 8,736,563.0 |
| Total | $33,241.13 |
What-If Tonnage Explorer
A back-of-the-envelope estimate — not a mineral resource.
- Gross tonnage
- 270 Mt
- Mineralized tonnage
- 135 Mt
- Contained Co (conceptual)
- 128.83M tonnes
- In-situ value (USD, conceptual)
- $4,487.6B
How to read this
- Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
- Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
- Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
- Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
- Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
- Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.
This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.