Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from MILI · 25-TVA-004 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$32.25
across 29.1 metres
Nugget — precious-metal value
$32.25 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$0.00 /t
gross $32.25 → recovered $29.02 − cost $40.00
Au
100.0%$32.25/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.34 g/t$32.250.340 g/t9.9
Silver$0.0029.940 g/t871.3
Platinum$0.001.018 g/t29.6
Palladium$0.001.034 g/t30.1
Rhodium$0.000.101 g/t2.9
Copper$0.000.315 %9.2
Zinc$0.001.143 %33.3
Nickel$0.000.196 %5.7
Lead$0.001.493 %43.4
Antimony$0.000.145 %4.2
Tungsten$0.000.009 %0.3
Lithium$0.000.117 %3.4
Tin$0.000.071 %2.1
Cobalt$0.000.093 %2.7
Molybdenum$0.000.073 %2.1
Uranium$0.000.017 %0.5
Iron Ore$0.0028.978 %843.3
Gallium$0.00113.686 g/t3,308.3
Total$32.25

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.