Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from NAU · LBS26-006 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$105.00
across 12.2 metres
Nugget — precious-metal value
$36.04 /t
34% of total value · base metals $68.96/t
Residual — net realizable value
$54.50 /t
gross $105.00 → recovered $94.50 − cost $40.00
Au
34.3%$36.04/t
Sb
65.7%$68.96/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold0.38 g/t$36.041.107 g/t13.5
Silver$0.0097.488 g/t1,189.4
Platinum$0.003.316 g/t40.5
Palladium$0.003.367 g/t41.1
Rhodium$0.000.327 g/t4.0
Copper$0.001.024 %12.5
Zinc$0.003.721 %45.4
Nickel$0.000.639 %7.8
Lead$0.004.860 %59.3
Antimony0.31 %$68.960.472 %5.8
Tungsten$0.000.029 %0.4
Lithium$0.000.381 %4.6
Tin$0.000.231 %2.8
Cobalt$0.000.301 %3.7
Molybdenum$0.000.238 %2.9
Uranium$0.000.055 %0.7
Iron Ore$0.0094.356 %1,151.1
Gallium$0.00370.172 g/t4,516.1
Total$105.00

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.