Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from AUMB · UG16-25-016 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$648.74
across 0.7 metres
Nugget — precious-metal value
$648.74 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$543.86 /t
gross $648.74 → recovered $583.86 − cost $40.00
Au
100.0%$648.74/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold6.84 g/t$648.746.840 g/t4.8
Silver$0.00602.328 g/t421.6
Platinum$0.0020.485 g/t14.3
Palladium$0.0020.802 g/t14.6
Rhodium$0.002.023 g/t1.4
Copper$0.006.328 %4.4
Zinc$0.0022.989 %16.1
Nickel$0.003.950 %2.8
Lead$0.0030.027 %21.0
Antimony$0.002.916 %2.0
Tungsten$0.000.182 %0.1
Lithium$0.002.354 %1.6
Tin$0.001.428 %1.0
Cobalt$0.001.862 %1.3
Molybdenum$0.001.471 %1.0
Uranium$0.000.342 %0.2
Iron Ore$0.00582.977 %408.1
Gallium$0.002,287.105 g/t1,601.0
Total$648.74

What-If Tonnage Explorer

A back-of-the-envelope estimate — not a mineral resource.

This is not a mineral resource estimate.This tool produces a rough, back-of-the-envelope figure from the dimensions, density, grade and mineralization you enter. It is not NI 43-101 compliant and was not prepared or reviewed by a Qualified Person. Any output is conceptual in nature; real deposits are irregular and grade varies, so actual contained metal may differ materially or be zero. Do not rely on these figures for investment decisions — always refer to the issuer’s NI 43-101 technical report.
Gross tonnage
270 Mt
Mineralized tonnage
135 Mt
Contained Au (conceptual)
29.69 Moz
In-situ value (USD, conceptual)
$87.6B

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat