Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from AUMB · UG16-25-016 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$878.26
across 0.6 metres
Nugget — precious-metal value
$878.26 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$750.44 /t
gross $878.26 → recovered $790.44 − cost $40.00
Au
100.0%$878.26/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold9.26 g/t$878.269.260 g/t5.6
Silver$0.00815.433 g/t489.3
Platinum$0.0027.733 g/t16.6
Palladium$0.0028.162 g/t16.9
Rhodium$0.002.739 g/t1.6
Copper$0.008.567 %5.1
Zinc$0.0031.123 %18.7
Nickel$0.005.347 %3.2
Lead$0.0040.650 %24.4
Antimony$0.003.948 %2.4
Tungsten$0.000.246 %0.1
Lithium$0.003.187 %1.9
Tin$0.001.933 %1.2
Cobalt$0.002.521 %1.5
Molybdenum$0.001.992 %1.2
Uranium$0.000.463 %0.3
Iron Ore$0.00789.236 %473.5
Gallium$0.003,096.285 g/t1,857.8
Total$878.26

What-If Tonnage Explorer

A back-of-the-envelope estimate — not a mineral resource.

This is not a mineral resource estimate.This tool produces a rough, back-of-the-envelope figure from the dimensions, density, grade and mineralization you enter. It is not NI 43-101 compliant and was not prepared or reviewed by a Qualified Person. Any output is conceptual in nature; real deposits are irregular and grade varies, so actual contained metal may differ materially or be zero. Do not rely on these figures for investment decisions — always refer to the issuer’s NI 43-101 technical report.
Gross tonnage
270 Mt
Mineralized tonnage
135 Mt
Contained Au (conceptual)
40.19 Moz
In-situ value (USD, conceptual)
$118.6B

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat