Morning briefing — free market intel before the open
Tool

Drill Calculator

Translate any polymetallic drill intercept into a dollar value per tonne. Live spot prices across 18 metals — adjust any input, switch currency, and read the precious-metal share (nugget) and net realizable value (residual).

Loaded from CAMB · P26-2697 drill result — edit any value to model your own scenario.
Spot Prices (editable)
Display currency:
Enter Drill Intercept
Estimate — Mo is thinly traded on LME. Industry valuations typically use Platts/Argus dealer oxide prices, which may differ from generic spot.
Recovery & Costs (editable assumption)

Used for residual (net) value below. Defaults are industry starting points — override for your deposit.

Total Value Per Tonne
$2,418.54
across 1.0 metres
Nugget — precious-metal value
$2,418.54 /t
100% of total value · base metals $0.00/t
Residual — net realizable value
$2,136.68 /t
gross $2,418.54 → recovered $2,176.68 − cost $40.00
Au
100.0%$2,418.54/t
Equivalent Grades
MetalInput Grade$/tonneEq. GradeGram-m
Gold25.5 g/t$2,418.5425.500 g/t25.5
Silver$0.002,245.522 g/t2,245.5
Platinum$0.0076.371 g/t76.4
Palladium$0.0077.552 g/t77.6
Rhodium$0.007.541 g/t7.5
Copper$0.0023.592 %23.6
Zinc$0.0085.706 %85.7
Nickel$0.0014.725 %14.7
Lead$0.00111.942 %111.9
Antimony$0.0010.872 %10.9
Tungsten$0.000.677 %0.7
Lithium$0.008.776 %8.8
Tin$0.005.323 %5.3
Cobalt$0.006.943 %6.9
Molybdenum$0.005.485 %5.5
Uranium$0.001.275 %1.3
Iron Ore$0.002,173.381 %2,173.4
Gallium$0.008,526.487 g/t8,526.5
Total$2,418.54

What-If Tonnage Explorer

A back-of-the-envelope estimate — not a mineral resource.

This is not a mineral resource estimate.This tool produces a rough, back-of-the-envelope figure from the dimensions, density, grade and mineralization you enter. It is not NI 43-101 compliant and was not prepared or reviewed by a Qualified Person. Any output is conceptual in nature; real deposits are irregular and grade varies, so actual contained metal may differ materially or be zero. Do not rely on these figures for investment decisions — always refer to the issuer’s NI 43-101 technical report.
Gross tonnage
270 Mt
Mineralized tonnage
135 Mt
Contained Au (conceptual)
110.68 Moz
In-situ value (USD, conceptual)
$326.5B

How to read this

  • Total value per tonne — the gross dollar value of the rock at current spot prices, before any recovery, mining, or processing cost. A real mine recovers 60–95% depending on metallurgy.
  • Nugget — the share of total value from precious metals (gold, silver, platinum, palladium, rhodium). Tells you whether it's really a precious-metals story or base metals dressed up by a high gold price.
  • Residual (net realizable) value — what's left after recovery and operating cost. Edit recovery % and cost per tonne to model your own deposit; this is the "real value," not the gross.
  • Equivalent grades — what the same total value looks like expressed as a single metal. Useful to compare polymetallic intercepts against a single-metal benchmark (e.g. AuEq, CuEq).
  • Gram-metres — equivalent grade × width. The standard junior-mining shorthand for intercept significance.
  • Spot prices are editable — override any number to model your own price deck. Live prices refresh hourly via Metals-API.

This calculator is for informational purposes only. It does not constitute investment advice or a valuation of any specific deposit, project, or company. Recovery rates, mining costs, processing costs, royalties, and metallurgy vary by deposit — residual value uses editable assumptions, not a deposit-specific study. Always read the original NI 43-101 or JORC report before drawing conclusions about a drill result.

Chat