Profile assembled from Strikepoint News signal data — drill results, warrant filings, financings, insider transactions, and news. Drill rock value per tonne is the gross in-situ value at today's spot prices, recomputed live. This page is for informational purposes only and is not investment advice; verify against the original filings before drawing conclusions.
Feasibility study (FS) · effective 2025-09-16
As disclosed by the company in its NI 43-101 technical report (effective 2025-09-16). Economic-study estimates are forward-looking and subject to the assumptions and risks in the original report; verify against the filing before drawing conclusions.
Superseded by the study above, and kept so the direction of travel is readable. Studies are never merged or averaged — each row is one report, on its own assumptions.
| Study | Effective | NPV | IRR | Initial capex | Mine life | Source |
|---|---|---|---|---|---|---|
| Feasibility | Nov 20, 2024 | $1,309 | 40.3% | $266 | 14 yrs | Report |
Each figure is the company’s own, as disclosed in the report it links to. Studies on different assumptions are not comparable line-for-line — read the report before drawing a conclusion from a change between them.