NI 43-101 mineral reserves (Proven & Probable), as disclosed by the company
Effective 2025-10-31
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Proven | 455,000 t | 454 g/t Ag · 4.79 % Pb · 0.45 % Cu | 6,639 koz Ag · 2,841 t Pb · 2,055 t Cu |
| Probable | 409,000 t | 609 g/t Ag · 4.24 % Pb · 0.52 % Cu | 8,014 koz Ag · 5,319 t Pb · 2,123 t Cu |
Mineral reserves as disclosed by the company in its NI 43-101 technical report(s), shown by deposit. Mineral reserves (Proven and Probable) are the economically mineable part of a Measured and/or Indicated Mineral Resource, demonstrated by at least a pre-feasibility study. Categories are reported separately and are not additive; where both Proven and Probable are reported, the combined “Proven and Probable” subtotal is omitted to avoid double-reading. Mineral reserves are reported SEPARATELY from mineral resources and are not added to them. Verify against the source report before drawing conclusions.
NI 43-101 mineral resource, as disclosed by the company
Effective 2025-10-31
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Measured | 800,000 t | 794 g/t Ag · 8.16 % Pb · 1.02 % Cu | 20,405 koz Ag · 139,128 t Pb · 8,160 t Cu |
| Indicated | 1.2 Mt | 744 g/t Ag · 6.58 % Pb · 0.88 % Cu | 27,515 koz Ag · 118,637 t Pb · 10,129 t Cu |
| Inferred | 4.7 Mt | 410 g/t Ag · 5.36 % Pb · 0.81 % Cu | 61,592 koz Ag · 250,258 t Pb · 15,625 t Cu |
Mineral resource estimate as disclosed by the company in its NI 43-101 technical report(s), shown by deposit. Categories are reported separately by confidence and are not additive; where both Measured and Indicated are reported, the combined “Measured and Indicated” subtotal is omitted to avoid double-reading. It cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Verify against the source report before drawing conclusions.
USA.TO
Americas Gold and Silver CorporationLoading price…
Loading price…
NI 43-101 mineral reserves (Proven & Probable), as disclosed by the company
Effective 2025-10-31
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Proven | 455,000 t | 454 g/t Ag · 4.79 % Pb · 0.45 % Cu | 6,639 koz Ag · 2,841 t Pb · 2,055 t Cu |
| Probable | 409,000 t | 609 g/t Ag · 4.24 % Pb · 0.52 % Cu | 8,014 koz Ag · 5,319 t Pb · 2,123 t Cu |
Mineral reserves as disclosed by the company in its NI 43-101 technical report(s), shown by deposit. Mineral reserves (Proven and Probable) are the economically mineable part of a Measured and/or Indicated Mineral Resource, demonstrated by at least a pre-feasibility study. Categories are reported separately and are not additive; where both Proven and Probable are reported, the combined “Proven and Probable” subtotal is omitted to avoid double-reading. Mineral reserves are reported SEPARATELY from mineral resources and are not added to them. Verify against the source report before drawing conclusions.
NI 43-101 mineral resource, as disclosed by the company
Effective 2025-10-31
| Category | Tonnage | Grade | Contained |
|---|---|---|---|
| Measured | 800,000 t | 794 g/t Ag · 8.16 % Pb · 1.02 % Cu | 20,405 koz Ag · 139,128 t Pb · 8,160 t Cu |
| Indicated | 1.2 Mt | 744 g/t Ag · 6.58 % Pb · 0.88 % Cu | 27,515 koz Ag · 118,637 t Pb · 10,129 t Cu |
| Inferred | 4.7 Mt | 410 g/t Ag · 5.36 % Pb · 0.81 % Cu | 61,592 koz Ag · 250,258 t Pb · 15,625 t Cu |
Mineral resource estimate as disclosed by the company in its NI 43-101 technical report(s), shown by deposit. Categories are reported separately by confidence and are not additive; where both Measured and Indicated are reported, the combined “Measured and Indicated” subtotal is omitted to avoid double-reading. It cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Verify against the source report before drawing conclusions.