Pre-feasibility study (PFS) · effective 2026-01-22
As disclosed by the company in its NI 43-101 technical report (effective 2026-01-22). Economic-study estimates are forward-looking and subject to the assumptions and risks in the original report; verify against the filing before drawing conclusions.
Superseded by the study above, and kept so the direction of travel is readable. Studies are never merged or averaged — each row is one report, on its own assumptions.
| Study | Effective | NPV | IRR | Initial capex | Mine life | Source |
|---|---|---|---|---|---|---|
| PFS | Dec 3, 2024 | $25,930,000 | 11.9% | $53,930,000 | 5.5 yrs | Report |
| Feasibility | Nov 30, 2024 | $12,670,000 | 156.1% | $4,150,000 | 1.2 yrs | Report |
| PEA | Nov 30, 2024 | $398,660,000 | 40.7% | $138,590,000 | 15 yrs | Report |
Each figure is the company’s own, as disclosed in the report it links to. Studies on different assumptions are not comparable line-for-line — read the report before drawing a conclusion from a change between them.
User-generated discussion. Not investment advice — verify claims against source filings.
Profile assembled from Strikepoint News signal data — drill results, warrant filings, financings, insider transactions, and news. Drill rock value per tonne is the gross in-situ value at today's spot prices, recomputed live. This page is for informational purposes only and is not investment advice; verify against the original filings before drawing conclusions.